Guangdong, China
Business Type:
Manufacturer/Factory, Trading Company
Management System Certification:
ISO 9001, ISO 14001, ISO/TS 16949
OEM/ODM Availability:
Yes
OEM/ODM Service
Sample Available
Overseas Agent / Branch
French / German / Japanese / Spanish / Portuguese Speaker

Plastic Mold, Injection Molding, Collapsible Core Tooling manufacturer / supplier in China, offering Customed White Plastic Mold Parts Electrical Control Box, Clips /16cavity/24cavity/48cavity/96cavity/108cavity, Socket /Housing/Sensor Box and so on.

Gold Member Since 2017
Audited Supplier

Customed White Plastic Mold Parts Electrical Control Box

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $3,000/ Set
Port: Shenzhen, China
Production Capacity: 100sets/Year
Payment Terms: T/T, D/P, Western Union, Money Gram
Shaping Mode: Injection Mould
Surface Finish Process: Polishing
Mould Cavity: Multi Cavity
Plastic Material: TPU
Process Combination Type: Single-Process Mode
Application: Commodity, Electronic, Hardware

You Might Also Like

Loading...

Basic Info

Model NO.: AE-ELE1002
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Certification: ISO
Standard: DME
Customized: Customized
Trademark: as per customer request
Transport Package: as Per Customer Request
Specification: as per customzer
Origin: China
HS Code: 8480719090

Product Description

AE network offer you world-class tooling and molding!
AE make good Plastic parts in the world! 

Plastic Injection Mold for Electrical Components

Main Technique Parameters
Main Technique Parameters
Mould Material45#, 50#, P20, H13, 718, 2738, NAK80, S136, SKD61 etc
Product MaterialABS, Nylon, PC, PP, PVC, POM, PMMA, PS, PE, PET, 
Rubber, Silicone, PA, PBT, PEI, TPE, TPU, etc.
Mould BaseLKM, DME, HASCO, etc.
Structure2 plate mold, 3 plate mold, core pulling mold
Runner SystemHot runner, Cold runner
CavitySingle cavity, multi cavity by requested
FinishCorrosion word, Mirror finish, Brushed
Mould life time500000~+1,000,000 shots
Mould standardHASCO, DME, MISUMI, or by requested etc.
SoftwareCAD, Pro-E, UG, solid works, etc.
Lead time3-10 weeks according to complexity of mould
PackagingFumigation-free wooden box or customised 


To reduce cost we factory remove to Dongguan, we can do precision 0.01, welcome to enjoy our one-stop services. At AE we guarantee your full satisfied!










 

Send your message to this supplier

*From:
*To:
avatar Miss -janet
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now